
For New Builds
Easy to design into new builds
To effortlessly create the most energy-efficient property possible. A few things to keep in mind for new builds. 3E should be installed up to the last 30–40 metres before the draw-off point for optimum comfort. Up to 12 storeys, no hot water recirculation is needed up through the floors; a short recirculation loop on the ground floor with 3E in the vertical shafts is sufficient. If the building has more than 12 storeys and you want to maintain optimum comfort, we recommend running hot water recirculation in one (1) shaft, then routing 3E out onto the floors. That way, only one shaft requires hot water recirculation, and none is needed out on the floors.






